PROGRESS REPORT - Overhaul of Etiainen

Yesterday, me and Nat got started on the beatdown of what we’ve got. Cleaned up the first classroom scene, added music (The Squirtle Piano that was never used) to the second encounter (outside). We added some bell noises to lead into the detention scene as well.
Next on the to-do list is to clean up some of the longish sections of the spaz-out scene (i.e. we spend too much time on extras and other trivial matters, plus some clean-up there), and completely overhaul the first encounter from the ground up, as well as perhaps changing the music in that scene (cause it just doesn’t suit at all).
As a quick addendum, we burned Smith’s copy for final submission, with the additions above included. It was not me or Nat’s choice to do this, btw - it was all him asking for a copy. The DVD isn’t perfect, but it stays the hounds for a few days until we clean up the CC copy, and get titling in. 
I won’t be here after school today, so Nat has the list of stuff that needs to be done, and I’ve posted the next stages of the cleanup here. I’m sure someone can  stay back and supervise her, maybe Yas.
There’s the current situation. More updates tomorrow as I get them.
RBZ!!, signing out.
Good Job, remember the 5 min limit, do nt get caught out into the detail only to have delete them later because of time. Work on it a bit more on friday, i might be there with you if i can go to school



Powered by Tumblr.